One building. Four moves.

ICG holds the lease, builds the capacity and fills it, with power at the center. The steps run in this order because each one unlocks the next.

  1. Master-lease the building

    ICG takes an existing building on a master lease from its owner, in a location chosen for its tenants, its power and its access.

  2. Improve for compute

    ICG's build team converts selected floors into Building-Integrated Compute while the office floors stay occupied.

  3. Power the floor

    Utility power feeds the compute floor, with backup generation and cooling on site. ICG works with the local utility on capacity and interconnection.

  4. Sign compute tenants

    AI compute tenants sign 15 year leases. Term follows tenant quality and power need.

Illustrative concept. Floor allocation, power and backup capacity are set per building.

Typical section · NTS

Building-Integrated Compute
AI compute office usersCompute floorGrid feedBackup generation and cooling
  • AI compute office users
  • Compute floor
  • Grid feed
  • Backup generation and cooling
Illustrative concept. Floor allocation, power and backup capacity are set per building.

Why This, Why Now

Transformed power is the center of gravity that attracts economic ecosystems.

Power decides where compute goes

The scarce input for AI compute is reliable power, not floor space. Existing buildings with utility capacity in place skip the longest wait in the process.

Sovereign by design

Organizations want their models and data on hardware they control, in a location they can name. On-premises compute in a known building delivers both.

Commercial real estate, put back to work

The building keeps its office tenants and adds a second use. The building earns from two kinds of tenant instead of one.